Friday 4 April 2014

Editing

When editing for our opening sequence we were unsure at first of how to use it and what we needed to do, we had to do a lot of pickups due to the low lighting in the house we was doing it in. However we did over come these things, in our final Part to edit we had to brighten certain parts such as the memories, we wanted the memories to look more vibrant and happy. We done this all on premier pro. When it came to doing the titles we had no idea how to do it, after we got taught we had the hang of it. Overall I think our titles worked perfectly with the way they were presented. Throughout this whole process of editing I think we worked well together and we finished everything on time, I think that after being taught a few tricks we got the hang of the programme and was able to complete the work. 

Thursday 3 April 2014

Narrative


Audience Feedback

This was some of the audience feedback we got from viewers of our film. We undertook this audience research when during editing so we could take on board comments whilst completing the project. Most of the feedback was that they enjoyed the narrative, however, felt the clips were too fast to fit our genre (Romantic Drama). This meant that when rewatching the timeline we took our some clips and tightened the transitions. This meant the continuity was rectified and far smoother to watch. 
One comment that we evaluated was that our protagonist walks too slowly down the stairs. When editing it ourselves we felt it fitted the pace of our film. We therefore, asked further audience members what they felt our the pace and walking down the stairs and they felt it suited the tone. Therefore, this piece of feedback was an anomaly.




Meeting 4th Feb 2014

 
Using Adobe Premiere Pro we started to look at the timeline of our film and work out what pick up we would need to undertake. When looking at the timeline we could see that we needed to edit our clips by changing the colour setting. By doing this we could see a clearer juxtaposition between the tone/mood of the clip. We also edited the colour so each clip was at a similar colour duration so the film has a continuity through the progress of the film.

Filming

This is one of our mistakes when filming the final scene. As you can see in the video the lighter and weather conditions would not set the piece of paper (photos) alight.

Monday 3 March 2014

music

This was our initial idea for the music for our opening sequence for 'Absence'. When creating our final piece of music on garage band we just some of the notes and melody blended with garage band loops. This made the music much more atmospheric.


Monday 24 February 2014

Logo For Production


We have created a logo that represents our production name. We decided to use this font as it parallels with the conventions of independent British film companies. This is realistic to our target audience and our film.

Wednesday 12 February 2014

Font Meeting

During our meeting on the 12/02/14 we discussed different fonts to use on our titles and the order in which it will go in. These are some possible ideas that we thought would be sutiable for our title.

Monday 10 February 2014

Filming

FINAL COPY


Due to this scene having a high risk of health and safety aspect we carefully thought of ways in order to be safe. First thing was the aspect of lighting the pictures we wanted to make sure that the weather conditions were suitable in order to make it light and for the weather to not be windy which would make the fire go out of control. The second thing we took into consideration was if the fire did get out of control we should fill up a large bucket of water from Danielle's house just in case. Fortunately, we didn't use the bucket of water as the lighting of the pictures went smoothly as could possible be.



MISTAKE 

Tuesday 4 February 2014

Locations


we chose these locations to use in our filming, we used the out door feild scene in school as one of the memories in the photo album, we chose this as it almost looks like a park and thought it would be a good place for this part of the shoot. we also chose the bench scene as one of the memories even though its in school it dont look like it so this was a could place to do a memory to put in the photo album, we chose Danielles house to do the main shooting, we chose this location as its close to school and a easier place to shoot at because of the amount of time we had.

Meeting on 3rd Feb 2014

Today we had a discussion on Facebook about shooting for the burning of the photo album. In this discussion we touched of our risk assessment and safety when burning the photo album.

Thursday 23 January 2014

Meeting 23rd Jan 2014: EDL

Today we discussed the order of our footage to start editing. We are going to use some clips twice for continuity and add effect. This is called the Editing Decision List. 


Monday 20 January 2014

Shooting:20th Jan 2014

Today we did reshooting after releasing that our previous shooting was to dark and didn't establish characters and movement. Therefore, today we reshot the house environment scenes.



Thursday 16 January 2014

Meeting Thur 16th Jan 2014

In today's meeting we discussed pick ups and filming.
Due to earlier problems of lighting issues we will be refilming on the Mon 20th Jan. This we will be working with new lighting to correct past errors.